Prince Edward Theatre
Work done
In 2004 prior to the opening of Mary Poppins, the Prince Edward Theatre was closed for a complete refurbishment including the main entrance, auditorium and bar area.
A new bar was created with a private room and roof terrace so that audiences could walk out on the balcony outside the dress circle.
A new box office and VIP area were formed and the restroom facilities increased and modernised.
In the auditorium, new seating, flooring, specialist lighting and finishes were installed.
Overview
- Client
- Delfont Mackintosh Theatres
- Sector
- Leisure
- Value
- 1.5m - 4.5m
- Location
- London
- Timescale
- 18 Weeks
- Architect
- The Arts Team at RHWL
- Quantity Surveyor
- Tim Gatehouse Associates
- Project Manager
- Peter Roberts at Delfont Mackintosh
- Services Consultant
- Furness Green Associates
- Lighting Consultant
- Phoenix Large/Lightmatters